
|
Exterior parts construction
Frame cover constructionIgnition switch removal and installation
Removal
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the ignition switch lead wire coupler (1).
Disconnect the immobilizer lead wire coupler (2).
(For e-02, 19, 24, 51)
Remove the harness clamp (3).
...
Crankcase breather (pcv) hose inspection
Inspect the crankcase breather (pcv) hose in the
following procedures:
lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Inspect the crankcase breather (pcv) hose (1) for
wear and damage.
If it is worn or damaged ...
Exhaust control valve inspection
Inspect exhaust control valve
initially at 1 000 km (600 miles, 2 months) and every
12 000 km (7 500 miles, 24 months) thereafter
Inspect exhaust control valve as follows:
remove the left side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Check t ...