
|
Exterior parts construction
Frame cover constructionSwingarm bearing removal and installation
Removal
Remove the swingarm. Refer to “swingarm removal and installation” .
Remove the swingarm pivot bearings (1) using the
special tool.
Special tool
(a):
09921–20240 (bearing remover set)
Remove the center spacer (2).
Remove the cushion lever bearing (3) usin ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...
Throttle body construction
Intake pipe
Evap system purge control solenoid valve
(e-33 only)
Evap canister (e-33 only)
Iat sensor
Isc valve hose
Ho2 sensor
Face
the clamp end left side.
Yellow
marking should face upward.
Face the
end of clamps upward and ke ...