Removal
Installation
Install the turn signal/side-stand relay in the reverse order of removal.
Water hose inspection
Inspect the water hoses in the following procedures:
remove the side cowlings. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Check the water hoses for crack, damage or engine
coolant leakage. If any defect is found, replace the
water hose wi ...
Ignition coil inspection
Refer to “electrical components location” in section 0a .
Ignition coil primary peak voltage
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect all ignition coil. Refer to “ignition coil and spark plug
removal and installation” .
...
Fuel injection system description
Gsx-r1000 motorcycles are equipped with a fuel injection system for emission
level control. This fuel injection system
is precision designed, manufactured and adjusted to comply with the applicable
emission limits. With varying engine
conditions, all of the fuel injection volumes are precisely ...