|
Rear shock absorber removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the rear shock absorber.
Remove the left muffler and muffler chamber heat guard no. 2. Refer ...
Spark plug inspection and cleaning
Inspect spark plug
every 6 000 km (4 000 miles, 12 months)
Heat range
Remove the spark plugs. Refer to “ignition coil and spark plug removal
and installation” in section 1h .
Check spark plug heat range by observing electrode
color. If the electrode of the spark plug is wet
appe ...
Rear wheel assembly removal and installation
Removal
Loosen the axle nut (1).
Raise the rear wheel off the ground and support the
motorcycle with a jack or wooden block.
Caution
make sure that the motorcycle is supported
securely.
Remove the axle nut (1).
Loosen the left and right lock-nuts (2) an ...