Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Engine mechanical

Special tools and equipment
Special tool ...

Schematic and routing diagram
...

Other materials:

Rear shock absorber adjustment
After installing the rear suspension, adjust the spring pre-load and damping force as follows: Spring pre-load adjustment The set length 179.3 Mm (7.06 In) provides the maximum spring pre-load. The set length 189.3 Mm (7.45 In) provides the minimum spring pre-load. Std position 184.3 ...

Precautions
Precautions for clutch system Refer to “general precautions” in section 00 (page 00-1). Schematic and routing diagram Clutch cable routing diagram Refer to “throttle cable routing diagram” in section 1d . Diagnostic information and procedures Clutch system symptom diagnosis ...

Cushion rod removal and installation
Removal Remove the right side cowling and side frame covers. Refer to “exterior parts removal and installation” in section 9d .  Support the motorcycle with a jack to relieve load on the cushion rod.  Remove the muffler chamber. Refer to “muffler / muffler chamber / exhaust ...

© 2011-2026 Copyright www.suzukigsxr.org