Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Front wheel assembly construction

Suzuki GSX-R. Front wheel assembly construction


  1. Brake disc bolt
  2. Brake caliper mounting bolt
  3. Front axle bolt
  4. Front axle pinch bolt
  5. Clearance
  6. 18 N·m (1.8 Kgf-m,
    13.0 Lbf-ft)
  7. 39 N·m
    (3.9 Kgf-m, 28.0 Lbf-ft)
  8. 100 N·m
    (10 kgf-m, 72.5 Lbf-ft)
  9. 23 N·m
    (2.3 Kgf-m, 16.5 Lbf-ft)

Apply grease.


Apply thread lock to the
thread part.

Front wheel components
Front axle Brake disc bolt Brake disc Dust seal Bearing Spacer Air valve Front wheel Wheel balancer Front tire Collar Front axle bolt ...

Front wheel assembly removal and installation
Removal Remove the brake calipers, left and right. Caution do not operate the brake lever with the caliper removed. Loosen two axle pinch bolts (1) on the right front ...

Other materials:

Combination meter removal and installation
Removal Remove the combination meter mounting bolt (1). Bushing Disconnect the coupler (2) and remove the combination meter assembly (3). Installation Install the combination meter in the reverse order of removal. Note fix the boot of ...

Special tools and equipment
Recommended service material Note required service material is also described in the following. “Rear lighting system construction” Special tool ...

DTC “c31” (p0705): gp switch circuit malfunction
Detected condition and possible cause Detected condition Possible cause No gear position switch voltage Gp switch voltage is not within the following range. Gp switch voltage > 0.6 V Gp switch circuit open or short.  Gp switch malfunction. ...

© 2011-2026 Copyright www.suzukigsxr.org