| Note I = inspect and clean, adjust, replace or lubricate as necessary. R = replace. T = tighten. |

Lubrication pointsConrod crank pin bearing inspection and
selection
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Inspection
Inspect the bearing surfaces for any signs of fusion,
pitting, burn or flaws. If any, replace them with a
specified set of bearings.
Place the plastigauge axially along ...
Ecm removal and installation
Removal
Remove the frame covers. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Disconnect the battery (–) lead wire.
Remove the tool set (1) and prop stay (2).
Disconnect the hose clamp (3) (e-33 only) and
starter relay (4).
Remo ...
Break-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...