Special tools and equipment
Schematic and routing diagramThrottle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Fuel injector inspection and cleaning
Inspect the fuel injector in the following procedures:
remove the fuel injector. Refer to “throttle body disassembly and
assembly” in section 1d .
Check the fuel injector for evidence of dirt and
contamination. If present, clean and check for
presence of dirt in the fuel lin ...
Generator inspection
Generator coil resistance
Remove the left side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Disconnect the generator coupler (1).
Measure the resistance between the three lead
wires.
If the resistance is out of specified value, replace the
...