Special tools and equipment
General descriptionFuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...
Loading guidelines
This motorcycle is primarily
intended to carry small items
when you are not riding with a
passenger. Follow the guidelines
below to carry a passenger or
cargo:
balance the load between the
left and right side of the motorcycle
and fasten it securely.
Place cargo weight as ...
Rear shock absorber bearing removal and installation
Removal
Remove the rear shock absorber. Refer to “rear shock absorber removal
and installation” .
Remove the spacer (1).
Remove the rear shock absorber bearing with the
special tool.
Special tool
(a): 09943–88211 (pinion bearing
installer)
Installation
C ...