Conclusion
FuelClutch cable removal and installation
Removal
Remove the left side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Disconnect the clutch cable from the clutch lever.
Refer to “handlebar removal and installation” in section 6b .
Remove the clutch cable as shown in the throttle cable ro ...
Brake fluid replacement
Caution
handle brake fluid with care: the fluid reacts
chemically with paint, plastic, rubber
materials, etc.
Front brake
Place the motorcycle on a level surface and keep the
handlebars straight.
Remove the brake fluid reservoir cap and
diaphragm.
Suck u ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...