Removal

Installation
Install the horn in the reverse order of removal.
Horn inspection
SpecificationsRear shock absorber removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the rear shock absorber.
Remove the left muffler and muffler chamber heat guard no. 2. Refer ...
Gearshift shaft oil seal / bearing removal and installation
Removal
Remove the gearshift shaft. Refer to “gearshift shaft / gearshift cam
plate removal and installation” .
Remove the gearshift shaft oil seal (1).
Remove the bearings (2) and (3) with the special
tools.
Special tool
(a): 09921–20210 (bearing remover
(12
mm))
...
Tire inspection
Inspect tire
every 6 000 km (4 000 miles, 12 months)
Tire tread condition
Operating the motorcycle with excessively worn tires will
decrease riding stability and consequently invite a
dangerous situation. It is highly recommended to replace
a tire when the remaining depth of tire tread reaches ...