
Throttle cable routing diagramFront brake components
Seal set
Piston and seal set
Brake pad spring
Brake pad set
Front brake disc
7.5
N·m (0.75 Kgf-m, 5.5 Lbf-ft)
15 N·m (1.5
Kgf-m, 11.0 Lbf-ft)
39 N·m (3.9
Kgf-m, 28.0 Lbf-ft)
18 N·m (1.8
Kgf-m, 13.0 Lbf-ft)
Apply thread lo ...
Front turn signal light removal and installation
Removal
Remove the screw.
Disconnect the front turn signal coupler (1).
Remove the turn signal light assembly (2).
Installation
Install the front turn signal light in the reverse order of
removal. ...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...