Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle body removal and installation

Suzuki GSX-R 1000 Service Manual / Engine / Engine mechanical / Repair instructions / Throttle body removal and installation

Removal

  1. Remove the side cowlings. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).
  2.  Remove the air cleaner box. Refer to “air cleaner box removal and installation” .
  3.  Remove the clamps (1).
  4.  Disconnect the iap sensor (2) from the vacuum hose.
  5.  Disconnect the stva lead wire coupler (3).
  6.  Disconnect secondary fuel injector couplers (4) and primary fuel injector couplers (5).
  7.  Disconnect the purge hose (6) from the evap system purge control solenoid valve. (E-33 only)

Suzuki GSX-R. Throttle body removal and installation


  1. Remove the clamp (7).
  2.  Disconnect the isc valve coupler (8).

Suzuki GSX-R. Throttle body removal and installation


  1. Place a rag under the fuel feed hose (9) and disconnect the fuel feed hose from the fuel pump.
For e-33
models, drain fuel from the fuel tank before disconnecting the fuel feed hose to prevent fuel leakage.

Suzuki GSX-R. Throttle body removal and installation


  1. Loosen the throttle body clamp screws, left and right.

Suzuki GSX-R. Throttle body removal and installation


  1. Lift up the throttle body from the intake pipes.
  2.  Disconnect the stp sensor coupler (10) and tp sensor coupler (11).

Suzuki GSX-R. Throttle body removal and installation


  1. Disconnect the throttle cables.
Caution

after disconnecting the throttle cables, do not snap the throttle valve from full open to full close. It may cause damage to the throttle valve and throttle body.

  1. Remove the throttle body.

Suzuki GSX-R. Throttle body removal and installation


Installation

Installation is in the reverse order of removal. Pay attention to the following points:

Suzuki GSX-R. Throttle body removal and installation


Suzuki GSX-R. Throttle body removal and installation


Suzuki GSX-R. Throttle body removal and installation


  1. 0 – 1 Mm (0 – 0.04 In)

Tightening torque throttle cable lock-nut: 4.5 N·m (0.45 Kgf-m, 3.0 Lbf-ft)

Throttle body construction
Intake pipe Evap system purge control solenoid valve (e-33 only) Evap canister (e-33 only) Iat sensor Isc valve hose Ho2 sensor Face the clamp end ...

Throttle body disassembly and assembly
Refer to “throttle body removal and installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups so that they can be ...

Other materials:

Side-stand removal and installation
Removal Support the motorcycle with a jack or wooden block. Caution  do not support the motorcycle with the exhaust pipes.  Make sure that the motorcycle is supported securely. Remove the side-stand as shown in the side-stand construction. Refer to ...

General precautions
Proper service and repair procedures are important for the safety of the service mechanic and the safety and reliability of the motorcycle.  When 2 or more persons work together, pay attention to the safety of each other.  When it is necessary to run the ...

Cylinder head related parts inspection
Refer to “cylinder head disassembly and assembly” . Cylinder head distortion Decarbonize the combustion chambers.  Check the gasket surface of the cylinder head for distortion. Use a straightedge and thickness gauge. Take clearance readings at several places. If readings exceed the ...

© 2011-2026 Copyright www.suzukigsxr.org