Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Tp reset
When replacing the throttle body assembly or tp sensor with a new one or reinstalling the tp sensor, reset the tp learned value in the following procedures: Note keep the throttle valves fully closed while resetting the tp learned value. Turn the ignition switch on.   ...

Cushion rod removal and installation
Removal Remove the right side cowling and side frame covers. Refer to “exterior parts removal and installation” in section 9d .  Support the motorcycle with a jack to relieve load on the cushion rod.  Remove the muffler chamber. Refer to “muffler / muffler chamber / exhaust ...

Valve clearance inspection and adjustment
Inspect valve clearance initially every 24 000 km (14 500 miles, 48 months) Inspection Valve clearance adjustment must be checked and adjusted, a) at the time of periodic inspection, b) when the valve mechanism is serviced, and c) when the camshafts are removed for servicing.  Lift an ...

© 2011-2026 Copyright www.suzukigsxr.org