Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Fuel pressure inspection
Keep away from fire or spark. Spilled gasoline should be wiped off immediately. Work in a well-ventilated area. Inspect the fuel pressure in the following procedures:  lift and support the fuel tank. Refer to “fuel tank removal and installati ...

Tire inspection
Inspect tire every 6 000 km (4 000 miles, 12 months) Tire tread condition Operating the motorcycle with excessively worn tires will decrease riding stability and consequently invite a dangerous situation. It is highly recommended to replace a tire when the remaining depth of tire tread reaches ...

Engine sprocket removal and installation
Removal Remove the gearshift link arm (1) from the gearshift shaft. Note mark the gearshift shaft head at which the gearshift link arm slit set for correct reinstallation. Remove the speed sensor (2). Remove the engine sprocket cover (3). Support the ...

© 2011-2026 Copyright www.suzukigsxr.org