Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Chassis bolt and nut inspection
Tighten chassis bolt and nut initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Check that all chassis bolts and nuts are tightened to their specified torque. Steering stem lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft) Stee ...

Battery charging
Initial charging filling electrolyte Note when filling electrolyte, the battery must be removed from the vehicle and must be put on the level ground. Remove the aluminum tape (1) which seals the battery filler holes “a”. Remove the caps (2) from the electrolyte ...

Swingarm bearing removal and installation
Removal Remove the swingarm. Refer to “swingarm removal and installation” .  Remove the swingarm pivot bearings (1) using the special tool. Special tool (a): 09921–20240 (bearing remover set) Remove the center spacer (2). Remove the cushion lever bearing (3) usin ...

© 2011-2026 Copyright www.suzukigsxr.org