Removal

Installation
Install the turn signal/side-stand relay in the reverse order of removal.
Starter relay inspection
Side-stand / ignition interlock system parts
inspectionCylinder head cover disassembly and
assembly
Disassembly
Remove the cylinder head cover. Refer to “engine top side disassembly” .
Remove the gaskets (1) and (2).
Remove the pair control solenoid valve (3) along
with the pair reed valve covers (4).
Remove the pair reed valves (5) and cmp sensor
(6).
As ...
Break-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...