Diagnostic information and procedures
Cooling circuit inspectionPair system inspection
Inspect pair system
every 12 000 km (7 500 miles, 24 months)
Inspect the pair (air supply) system periodically. Refer to “pair system
inspection” in section 1b .
Throttle valve synchronization
Inspect throttle valve synchronization
initially at 1 000 km (600 miles, 2 months) (e-33 only)
and ...
Radiator reservoir tank inspection
Inspect the radiator reservoir tank in the following
procedures:
remove the right side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Inspect the radiator reservoir tank (1) for leaks. If any
defects are found, replace the radiator reservoir tank
...
Battery current leakage inspection
Inspect the battery current leakage in the following
procedures:
turn the ignition switch off.
Remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Disconnect the battery (–) lead wire.
Measure the current betwee ...